SARNIA TRANSPORTATION SAFETY AND HEALTH COMMITTEE
SEPTEMBER 10, 1997
CANADIAN NATIONAL
P. O. BOX 98
SARNIA, ONTARIO
N7T 7H8
PHONE 519-339-1292
FAX 339-1285
MEETING MINUTES
DATE: SEPTEMBER 10, 1997
LOCATION: CN TOWER BOARD ROOM
CHAIRED BY: BILL GLASS
RECORDER: DEZ GLASS
COMMENCED: 0900HRS
ADJOURNED: 1400HRS
MEMBERS PRESENT:
STEVE HICKEN TRACK SUPERVISOR
DEBBIE LASENBY CAW
DEAN SCARROW UTU
LARRY LaFOND BLE
PAUL McCALLUM UTU
GUESTS:
JOB BRIEFING: LARRY LaFOND BRIEFED THE COMMITTEE ON THE ALARM SYSTEM, FIRE EXITS, PULL STATION, FIRE EXTINGUISHERS LOCATION AND ASSEMBLY AREA. INCASE OF EMERGENCY CALL EXT. 221 TOWER YARDMASTER. INCASE OF AN EMERGENCY DEZ GLASS WOULD BE FIRST AIDER. YARD EVACUATION AREAS WERE DESIGNATED AS CONTAINED IN THE SARNIA EVACUATION MANUAL.
SAFETY AND HEALTH SUGGESTIONS/HAZARD NOTICES 1997
STATISTICS
TOTAL PENDING PREVIOUS YEAR NIL
97 JAN 14 14 00
97 FEB 09 09 00
97 MAR 11 11 00
97 APR 09 08 01
97 MAY 13 13 00
97 JUN 07 06 01
97 JUL 10 10 00
97 AUG 07 02 05
97 SEP 11 10 01
97 OCT 00 00 00
97 NOV 00 00 00
97 DEC 00 00 00
TOTAL YEAR 91
TOTAL RESOLVED 83
TOTAL PENDING 08
SAFETY HAZARDS COMPLETED SEPTEMBER 1997
01 46255 97/08/15 ANDY BUTT CNDR
J007 LEAD TRACK SHOULD BE CHECKED FOR GAGE. WEEDS MILE 1 ST. CLAIR SPUR TO MILE 2.
COMPLETE GAUGE CHECKED. WEEDS SEE NEW BUSINESS.
02 46281 97/08/17 TIM GLOVER CNDR
AUTOMATIC SWITCHES TO BE REPLACED BY BUTTERFLY SWITCH HANDLE.
COMPLETE SAFETY COMMITTEE HAS PROPOSED INSTALLATION OF THESE TYPES HANDLES AND HAS BEEN ADVISED WILL BE INSTALLED WHEN EXISTING SWITCHES ARE REPLACED.
03 43970 97/08/17 GARRY McCALLUM CNDR
04 46274 97/08/15 WAR BURR CNDR
05 46287 97/08/14 CHARLIE KNIGHT
WEEDS KOMOKA SA40
COMPLETE ENGINEERING
06 46288 97/08/26 DEAN SCARROW CNDR
MUD ROAD BED AND SWITCHING LEAD AND FROG EAST END "C" YARD AT INDIAN ROAD OVER PASS.
COMPLETE ENGINEERING ADVISED THEY WILL MONITOR THE SITUATION AND WILL BE UNDER CUTTING 98 SEASON.
07 46289 97/08/26 DEAN SCARROW CNDR
SWITCH POINTS WEST END A20
COMPLETE ENGINEERING EXAMINED AND REPORTED WITHIN GUIDELINES
08 46285 97/09/07 GARTH MALLOT ENGR
SEATBELTS MISSING IN SOME US CABS
COMPLETE CITY CAB RESPONDED THEY WOULD ENSURE ALL CABS TRANSPORTING CANADIAN CREWS WOULD HAVE SEAT BELTS
09 46294 97/08/24 TIM GLOVER CNDR
MILE 57 DUNDAS SUBDIVISION RULE 42/43 SIGNAL STAFF STILL IN PLACE
COMPLETE REMOVED ENGINEERING 97/08/25
10 43969 97/08/18 WARD BURR
LOCOMOTIVE DWP NOISY, AIR BRAKES EXHAUST IN CAB, AND OPERATION CAB FILTHY.
COMPLETE SAFETY COMMITTEE FORWARDED TO MOTIVE POWER.
SAFETY HAZARDS PENDING FROM OTHER MONTHS
01 43933 97/04/09 LARRY LaFOND ENGR
INSPECTION LIGHTS SNIDER WEST
COMPLETE INSPECTION LIGHT OPERATING
02 46273 97/08/08 BERNIE SMITS CNDR
SWITCHES A16/A26 NEED ADJUSTING
COMPLETED 070910 ENGINEERING.
SAFETY HAZARDS PENDING SEPTEMBER 1997
01 46290 46291 97/09/04 DEAN SCARROW CNDR
FIRE HYDRANTS LOCATION C-12 SWITCH MAINTENANCE SCHEDULE REQUESTED.
PENDING FORWARDED TO FACILITY MAINTENANCE
02 46295 97/09/08 BERNIE SMITS CNDR
SWITCHES A25 AND A27 NEED ADJUSTING OR LUBRICATION
PENDING ENGINEERING
03 43933 97/04/09 LARRY LaFOND ENGR
PORT A JOHN SNIDER WEST
UNFINISHED BUSINESS
01 SARNIA EMERGENCY TERMINAL PLAN SAFETY COMMITTEE LARRY LaFOND TO REPRESENT COMMITTEE TO FINALIZE PLANS.
02 PULL BY SHELTERS MacGREGOR ROAD BILL GLASS TO REVIEW
03 BRUSH WEEDS ST. CLAIR SPUR WAITING BRUSH CUTTER
NEW BUSINESS
01 COMMITTEE DISCUSSED CHANGES TO EVACUATION MANUAL AND ELECTED LARRY LaFOND TO REPRESENT THE COMMITTEE AT A MEETING TO FINALIZE ALL SUBMISSIONS AND RECOMMENDATIONS.
02 COMMITTEE DISCUSSED THE INSTALATION OF BUTERFLY HANDLES ON AUTOMATIC SWITCHES AND ADVISED OTHER TERMINALS HAVE MANY INSTALLED AS OF THIS DATE.
03 COMMITTEE DISCUSSED GENERAL YARD CONDITIONS AND WERE CONCERNED WITH THE LACK OF WEED CONTROL HOWEVER THE COMMITTEE WAS ADVISED BRUSH CUTTER EXPECTED AND CONDITIONS WOULD BE IMPROVED.
04 COMMITTEE DISCUSSED POSTING AVAILABLE PHONE NUMBERS OF COMMITTEE MEMBERS AND TO ARRANGE AN APPROPRIATE POSTING OF SAME.
05 COMMITTEE DISCUSSED A MAILING LIST FOR THE MINUTES OF MEETING.
06 COMMITTEE DISCUSSED RECENT ACCIDENTS AND INJURIES.
ACCIDENT REPORT SEPTEMBER 1997
97/08/15 J010 DERAILMENT SUSPECTED TRACK FAILURE CUSTOMER SIDING UNDER INVESTIGATION
97/08/27 A43 DERAILMENT CROSSED DRAW BARS UNDER INVESTIGATION
97/08/29 C7 WEST END DERAILMENT EQUIPMENT FAILURE RESTRICTIONS UNDER INVESTIGATION
97/09/05 CIL Q40 DERAILMENT CUSTOMER TRACKAGE UNDER INVESTIGATION
PERSONAL INJURY REPORT AND ACCIDENT 1997
AUGUST DAYS SINCE LAST LOST TIME
50 18 LEFT SHIN
51 28 LOWER BACK
52 28 BACK
53 27 BACK
SEPTEMBER
54 09 BACK LOST TIME 21 DAYS
SAFETY RULE OF THE MONTH
JOB BRIEFING
STEP 111: BRIEFING FOR SPECIAL CONDITIONS
A: COMPLEX JOBS:
1. BRIEF ONLY A PORTION OF THE JOB
2. GIVE ADDITIONAL BRIEFING AS THE JOB PROGRESSES
B. CHANGE JOB CONDITIONS:
WHEN IT BECOMES NECESSARY TO CHANGE PLANS AND PROCEDURES AS THE JOB PROGRESSES, BRIEF EMPLOYEES ON THESE CHANGES.
NEXT MEETING
NEXT REGULAR MEETING OF THE SARNIA TRANSPORTATION SAFETY AND HEALTH COMMITTEE TO BE HELD WEDNESDAY OCTOBER 08, 1997.
BILL GLASS CO-CHAIRPERSON DEBBIE LAZENBY CO-CHAIRPERSON
| Related Information | New! FavouriteLinks | Greivance Entry Forms | UTU Home Page | Members E-Mail |